Whitney Engineering Ltd

Whitney Products

Site Navigation Bar

Page Contents

TU UPRIGHT COLUMN CONCRETE SKIP

The TU Centre Discharge Column Concrete Skip is designed to enable concrete to be poured into narrow shuttering or columns. The skips are fitted with a patented integral gate which ensures continuity of concrete flow and a 200mm diameter 3 metre long heavy duty discharge hose which prevents segregation.

Gate operation is by means of a nylon rope attached to a spring return lever ensuring excellent control whilst allowing the operator to control the pour from ground level.

Options available for the TU Concrete Skip are a quick release mechanism which allows for easy changing of discharge hose diameter and length.

Also available are specifically designed gates for use with very fluid self compacting concretes.

Other sizes are available on request

TU UPRIGHT COLUMN CONCRETE SKIP Image
pdfView The Brochure Page in PDF Format

TU UPRIGHT COLUMN CONCRETE SKIP Table