The TUC Centre Discharge Column Concrete Skip is designed to enable concrete to be poured into narrow shuttering or columns. The skips are fitted with a patented integral gate which ensures continuity of concrete flow and a 200mm diameter 3 metre long heavy duty discharge hose which prevents segregation.
Gate operation is by means of a nylon rope attached to a spring return lever ensuring excellent control whilst allowing the operator to control the pour from ground level.
The TUC is a rollover type skip whereby the concrete skip sits in the horizontal position for filling and reverts to the vertical when in use.
Options available for the TUC are a quick release mechanism which allows for easy changing of discharge hose diameter and length.
Also available are specifically designed gates for use with very fluid self compacting concretes.





