Whitney Engineering Ltd

Whitney Products

Site Navigation Bar

Page Contents

TUD FORKLIFT COLUMN CONCRETE SKIP

The TUD Offset Discharge Column Concrete Skip can be used with both crane and forklift and is designed to enable concrete to be poured into narrow shuttering or columns. The skips are fitted with a patented integral gate which ensures continuity of concrete flow and a 200mm diameter 3 metre long heavy duty discharge hose which prevents segregation.

The concrete skips offset discharge enables the skip to be used close to the side of an existing wall where access with a centre discharge skip may be a problem.

Gate operation is by means of a nylon rope attached to a spring return lever ensuring excellent control whilst allowing the operator to control the pour from ground level.

Options available for the TUD are a quick release mechanism which allows for easy changing of discharge hose diameter and length.

Also available are specifically designed gates for use with very fluid self compacting concretes.

TUD FORKLIFT COLUMN CONCRETE SKIP Image
pdfView The Brochure Page in PDF Format

TUD FORKLIFT COLUMN CONCRETE SKIP Table